
A plant that processes waste to recycle it into resources
- Waste Fuel Conversion Plant(SRF, etc.)
- Recyclables Sorting Plant
- Food Waste Recycling Plant
- Sewage Sludge Treatment Plant

field of business

A plant that processes waste to recycle it into resources

A plant that produces waste solid fuel through shredding, sorting, crushing, etc. of municipal waste and industrial waste in compliance with the Law.
A plant consists of Shredding, Sorting, Crushing, Packaging, Deodorization Equipment, etc.
| Project name | Fuel | Capacity | Client | Scope of work | Period |
|---|---|---|---|---|---|
| Gwangju MSW Fuel Conversion Plant | Municipal Waste | 800 t/d | POSCO E&C | Bidding/Basic design/Detail Design | 2013.09 ~ 2016.11 |
| Sejong City MSW Fuel Conversion Plant | Municipal Waste | 130 t/d | Taeyoung Construction | Detail Design | 2008.12 ~ 2012.12 |
| Metropolitan Area Combustible Waste Fuel Conversion Facility | Municipal Waste | 100 t/d x 2 | Taeyoung Construction | Bidding/Basic design/Detail Design | 2007.07 ~ 2008.11 |

A plant that sorts recyclable materials such as paper, glass bottles, plastics, iron cans, and aluminum cans sort them by categorize to be easy for recycling.
A plant consists of Shredding, Sorting, Crushing, Packaging, Deodorization Equipment, etc.
| Project name | Fuel | Capacity | Client | Scope of work | Period |
|---|---|---|---|---|---|
| Included in Hwaseong Pyrolysis and Incineration Plant | Recyclable Waste | 100 t/d | POSCO E&C | Basic design | 2006.10 ~ 2006.12 |
| Included in Goyang Pyrolysis and Incineration Plant | Recyclable Waste | 50 t/d | POSCO E&C | Basic design/Detail design | 2005.12 ~ 2010.06 |
| Included in Yangju Pyrolysis and Incineration Plant | Recyclable Waste | 30 t/d | POSCO E&C | Basic design | 2005.09 ~ 2005.12 |
| Included in Jecheon Waste Incineration Plant | Recyclable Waste | 30 t/d | Daewoo E&C | Basic design | 2005.07 ~ 2005.10 |
| Included in Yangsan Pyrolysis and Incineration Plant | Recyclable Waste | 800 t/d | POSCO E&C | Detail Design | 2004.03 ~ 2006.11 |
| Included in Jeonju Waste Incineration Plant | Recyclable Waste | 50 t/d | Samsung C&T | Detail Design | 2003.01 ~ 2005.11 |
| Included in Jeonju Waste Incineration plant | Recyclable Waste | 50 t/d | GS E&C | Basic design | 2002.07 ~ 2002.10 |

A facility that turns food waste into feedstuff, compost, and biogas through aerobic or anaerobic treatment
A facility consists of Crushing, Sorting, Aerobic Treatment, Anaerobic Treatment, Packaging, Deodorization Equipment, etc.
| Project name | Fuel | Capacity | Client | Scope of work | Period |
|---|---|---|---|---|---|
| Included in Jecheon Waste Incineration Plant | Food Waste | Aerobic composting 20 t/d | Daewoo E&C | Basic design | 2005.07 ~ 2005.10 |
| Included in Jeonju Waste Incineration plant | Food Waste | 50 t/d | Samsung C&T | Basic design | 2002.07 ~ 2002.10 |
| Incheon Food Waste Disposal Plant | Food Waste | 10 t/d | Samsung C&T | Basic design | 1999.11 ~ 1999.12 |

A plant that dries sewage sludge or utilizes dried sludge to manufacture fuel pellets or for direct incineration
A plant consists of Drying, Sludge Fuel Manufacturing, Incinerating, Packaging, Deodorization Equipment, etc.
| Project name | Fuel | Capacity | Client | Scope of work | Period |
|---|---|---|---|---|---|
| Busan Sewage Sludge Treatment Plant | Sewage Sludge | 550 t/d | POSCO E&C | Basic design | 2010.02 ~ 2010.05 |
| Cheongju Sewage Treatment Plant | Sewage Sludge | 135 t/d | Kolon Global | Basic design | 2009.12 ~ 2010.08 |
| Suwon Sewage Sludge Treatment Plant | Sewage Sludge | 450 t/d | POSCO E&C | Detail Design | 2008.04 ~ 2009.12 |
| Masan Sludge TreatmentPlant | Sewage Sludge | Wet Sludge Drying : 200 t/d Sludge Incineration : 90 t/d |
Hyoseong Ebara Environment | Basic design | 2005.12 ~ 2006.02 |
| Bucheon Sewage Sludge Treatment Plant | Sewage Sludge | Wet Sludge Drying : 300 t/d Sludge Incineration : 180 t/d |
Daewoo E&C | Basic design | 2004.12 ~ 2005.02 |
| Jeonju Sewage Sludge Treatment Plant | Sewage Sludge | Wet Sludge Drying : 200 t/d Sludge Incineration : 100 t/d |
Samsung C&T | Basic design/Detail design | 2004.10 ~ 2004.11 |
| Ansan Sewage Sludge Treatment Plant | Sewage Sludge | Wet Sludge Drying : 100 t/d Sludge Incineration : 80 t/d |
Dohwa Engineering | Basic design/Detail design | 2004.06 ~ 2004.08 |
| Osan Sewage Treatment Sludge Incineration Plant | Sewage Sludge | Wet Sludge Drying : 40 t/d Sludge Incineration : 40 t/d |
GS E&C | Basic design/Detail design | 2000.03 ~ 2000.08 |
| Seoul Ganyang/Nanji Sewage Sludge Incineration Plant | Sewage Sludge | Wet Sludge Drying : 150 t/d Sludge Incineration : 90 t/d |
Samsung C&T | Basic design | 2000.01 ~ 2000.05 |